Mostrar el registro sencillo del ítem
Fostering in-process inspection during process planning using tolerance charting
dc.contributor.author | Bruscas Bellido, Gracia M. | |
dc.contributor.author | Romero Subirón, Fernando | |
dc.contributor.author | Serrano Mira, Julio | |
dc.contributor.author | Rosado Castellano, Pedro | |
dc.date.accessioned | 2014-06-03T09:47:58Z | |
dc.date.available | 2014-06-03T09:47:58Z | |
dc.date.issued | 2013 | |
dc.identifier.citation | BRUSCAS, G. M., et al. Fostering in-process inspection during process planning using tolerance charting. Procedia Engineering, 2013, vol. 63, p. 200-207 | ca_CA |
dc.identifier.issn | 1877-7058 | |
dc.identifier.uri | http://hdl.handle.net/10234/94274 | |
dc.description.abstract | Integrated development of machining and inspection plans is essential in dynamic manufacturing environments, especially when right first time manufacturing is required. In this work, a methodology, based on a new and extended use of tolerance charting, that allows incorporation of in-process inspection operations to improve process plans is presented. The methodology proposes the transfer of the manufacturing specification tolerance between surfaces to specification tolerances established between these surfaces and a common reference system. In this way, all variability sources originated by part locating and fixturing can be separately considered from the ones originated by the process-machine system. This circumstance allows a more accurate calculation of operation capability indexes and eases the analysis and improvement of critical operations. To prove methodology potential, an application case is showed. | ca_CA |
dc.format.extent | 8 p. | ca_CA |
dc.format.mimetype | application/pdf | ca_CA |
dc.language.iso | eng | ca_CA |
dc.publisher | Elsevier | ca_CA |
dc.relation.isPartOf | Procedia Engineering (2013) vol. 63 | ca_CA |
dc.rights | © Elsevier | ca_CA |
dc.rights.uri | http://rightsstatements.org/vocab/InC/1.0/ | * |
dc.subject | Integrated process planning | ca_CA |
dc.subject | In-process inspection | ca_CA |
dc.subject | Tolerance charting | ca_CA |
dc.title | Fostering in-process inspection during process planning using tolerance charting | ca_CA |
dc.type | info:eu-repo/semantics/article | ca_CA |
dc.identifier.doi | http://dx.doi.org/10.1016/j.proeng.2013.08.175 | |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | ca_CA |
dc.relation.publisherVersion | http://ac.els-cdn.com/S187770581301388X/1-s2.0-S187770581301388X-main.pdf?_tid=f4dc9baa-eb03-11e3-bda9-00000aacb362&acdnat=1401788977_8150d5fd967062a6421912eb629dc56e | ca_CA |
Ficheros en el ítem
Ficheros | Tamaño | Formato | Ver |
---|---|---|---|
No hay ficheros asociados a este ítem. |
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
ESID_Articles [459]